You can ride from the shore of Salem Lake to West Fourth Street without leaving a greenway. Salem Lake Trail feeds the Salem Creek Greenway. Salem Creek joins the Long Branch Trail and the Strollway. The Strollway hands off to the Twin City Trail, which runs past Truist Stadium. Five trails link into one chain, and the strength of that chain depends on one low spot north of Reynolds Park Golf Course, where Salem Creek often runs straight across the pavement.
The City's open house on October 21 is about that spot. It is also the clearest way to see how the whole system fits together right now.
The chain, end to end
In September, the Winston-Salem Area Transportation Planning Organization and Piedmont Legacy Trails released the Winston-Salem Area Greenway Guide. It is a free resource covering 19 greenways and trail segments in Winston-Salem, Kernersville, Clemmons and Bermuda Run, more than 30 miles of trail in all. In the City's announcement, WSATPO Bicycle & Pedestrian Coordinator Liam Bowman said the guide "includes everything from trail distance and surface to parking and connections, putting all the information people need in one place."
Read the guide's entries in order and the five urban trails line up like this:
- Salem Lake Trail, a 7-mile loop of crushed limestone around the lake. It is mostly shaded, with restrooms at both the Salem Lake Road and Linville Road trailheads.
- Salem Creek Greenway, 5.2 paved miles that the guide calls the "central spine" of the city's network. It links to Reynolds, Central, Happy Hill and Washington Parks and to Gateway Nature Preserve, with parking at Marketplace Mall on Peters Creek Parkway, Washington Park, Reynolds Park and Salem Lake Park.
- Long Branch Trail, 1.6 paved miles. It follows an old railroad line along Research Parkway through the Innovation Quarter, with street connections at Martin Luther King Jr. Drive, 7th, 4th and 3rd Streets, and Research Parkway.
- The Strollway, 1.2 partially paved miles running from downtown to Old Salem. At its north end is the Strollway Pedestrian Bridge, recorded as the first land bridge in North Carolina. At its south end is the Heritage Bridge, a timber covered bridge built in the Moravian settlers' style that leads to the Old Salem visitor center.
- Twin City Trail, 0.9 paved mile. It branches off the Strollway on its own pedestrian bridge, runs under Salem Parkway, crosses the award-winning Green Street Pedestrian Bridge, passes Truist Stadium and ends in the residential stretch of West Fourth Street.
The published lengths of those five pieces add up to just under 16 miles, about half the mileage of the entire 19-trail guide. Most of the regional network's distance runs through this one line, and every trip between the lake and downtown uses the Salem Creek Greenway.
Where the spine gets wet
The trouble spot is about 3,200 feet west of where the Salem Creek Greenway meets the Salem Lake Trail, between 2600 Lowery Street and Reynolds Park Golf Course. The City's feasibility study site says this section sits very close to water level, partly within the Salem Creek floodway, and at a low point in the area. Because of that, "even minimal flooding often encroaches on the greenway." At one low spot, the study says, "the creek often flows directly over the greenway." That adds wear to the asphalt and raises maintenance costs. The City's September notice describes the result as "recurring flooding and periodic closures."
The study materials don't say how often the path closes or how a closure is signed. Neither one has a public schedule. For anyone riding from the lake toward downtown, the practical effect is that this single low crossing makes the whole chain less dependable after rain.
Two ways to rebuild it
The design criteria call for an elevated crossing, expected to be a steel-truss bridge with a concrete deck. The study has two alignments on the table, and they lead to noticeably different rides.
| Alternative 1 | Alternative 2 | |
|---|---|---|
| Route | Stays closer to the existing corridor and the creek, shorter with fewer turns | Runs farther south and is longer, with more turns |
| Grades | Gentler grades, shorter steep segments | Longer runs of steeper grade, broken up by landing areas |
| Floodplain | Stays lower before the crossing, with a slightly longer boardwalk on the west end | Climbs out of the floodplain earlier |
| Crossing point | Slightly farther downstream, to the west | Set back farther from the creek |
| Overlook | About 15 by 25 feet | Circular gathering area with a radius of about 25 feet |
| Construction tradeoff | More excavation and hillside grading, fewer changes at the creek banks | May reduce long-term maintenance tied to flooding |
The study summarizes the choice as "user experience versus floodplain avoidance and expanded amenities." A cyclist covering the full lake-to-downtown run would probably feel the gentler grades of Alternative 1. A family stopping at the creek would get more out of Alternative 2's larger overlook, which is sized for small groups. On maintenance, Alternative 2's earlier climb keeps more of the path out of routinely flooded ground.
The public gets one more chance to weigh in before a recommendation is final. The Salem Creek Greenway Low Water Crossing Feasibility Study open house runs from 5:30 to 7:30 p.m. on Wednesday, October 21, 2026, at the Salem Lake Marina, 815 Salem Lake Road. It is drop-in, and a public survey is posted on the study site. The study's schedule lists the alternatives analysis for October 2026 and the final feasibility report for February 2027. Neither document sets a construction date.
Why the lake end matters more each year
The crossing sits between Salem Lake and downtown, and the lake end of the chain is about to reach farther. The Winston-Salem Journal reported that a planned 1.25-mile Piedmont Greenway segment would run from Salem Lake toward East Forsyth High School and Hastings Hill Road. Bids are expected late this year, construction in early 2027 and completion targeted for 2028. The Piedmont Greenway is the long-planned route meant to one day connect Winston-Salem and Greensboro, with Kernersville's Kerner Mill Greenway as a central hub.
As more trail reaches Salem Lake from the east, more people will use the Salem Creek Greenway to get from the lake into the city. Every one of them will pass the low crossing north of Reynolds Park Golf Course.
What is built, and what is still a drawing
The downtown end of the chain has its own list of planned extensions, and the timelines vary a lot:
- Twin City Trail to Lockland Avenue. The guide describes a planned extension from West Fourth Street to Lockland Avenue that would connect to Atrium Health Wake Forest Baptist Medical Center. For now, the trail ends at West Fourth.
- Long Branch Trail north to 25th Street. The guide shows a future extension across Martin Luther King Jr. Drive to 25th Street near Blum/Blanding Park. Visit Winston-Salem lists groundbreaking in 2027 and completion in 2028.
- Long Branch Phase 3. A feasibility study is looking at routes from 25th Street toward the future Grounds development near Wake Forest's athletics facilities, the Winston-Salem Fairgrounds, Lawrence Joel Veterans Memorial Coliseum and the Intergenerational Center. Its public meeting was held September 30.
None of these extensions will be open this fall. The rideable chain is the five trails above, and the crossing study is the only project on it with public input open this month.
Stops along the way
The chain runs past enough coffee and bakeries to break up the ride. The guide notes that restrooms along Long Branch are inside private businesses, and the Old Salem visitor center has public restrooms by the Strollway.
Innovation Quarter, off Long Branch. The Long Branch Trail has a direct pedestrian connection at 3rd Street. Krankies Coffee is at 211 East 3rd Street, open from 8 a.m. to 3 p.m. on weekdays and 8 a.m. to 2 p.m. on weekends, with a fall 2026 menu posted. Those weekend hours favor a morning ride. The Innovation Quarter's dining list includes DeBeen Espresso at 231 E. 5th Street and Incendiary Brewing at 486 N. Patterson Avenue, Suite 105.
Old Salem, at the Strollway's south end. Old Salem's venues page lists Winkler Bakery and Muddy Creek Café as open with no ticket required, so a stop for baked goods or café food after crossing the Heritage Bridge doesn't need a museum admission.
West Fourth and Brookstown. Camino Bakery is downtown at 310 B W. 4th Street. It opens at 7 a.m. daily, closes at 6 p.m. Monday through Wednesday and stays open until 10 p.m. Thursday through Sunday. BYGood Coffee is at 301 Brookstown Avenue, Suite 300, open 7 a.m. to 5 p.m. on weekdays and 8 a.m. to 5 p.m. on weekends.
A full out-and-back from the marina to West Fourth Street could start with coffee in the Innovation Quarter, stop at Winkler after the Heritage Bridge, turn around at the Green Street Pedestrian Bridge and Truist Stadium, then return past Reynolds Park. That return leg crosses the low spot on Salem Creek, so the crossing is worth checking after a wet week.
Zach grew up in Winston-Salem, and he pays as much attention to which trailhead a home sits near as to its square footage. If you're thinking about a move and want to know how close different parts of town are to this greenway chain, Zach Dawson can walk you through it over a consultation. Schedule a Consultation.